What information do I need to submit along with my building permit application?

An approximate cost of the work must be provided. Site plans, foundation plans and floor plans may be required. These plan specifications and diagrams must be submitted for review that adequately detail how the proposed work is to be completed. The submitted plans shall be complete enough that the inspector could build the project according to the submitted plans.

Show All Answers

1. How do I apply for a building permit?
2. Does the City require building permits for new structures or alterations and additions to existing structures?
3. Do I need a building permit to construct a fence?
4. Do I need a permit for a sign for my business?
5. Who can I contact if I need rental property codes or have questions?
6. Does the City of Vermillion inspect for mold?
7. My dog went missing, who do I contact?
8. Does the City of Vermillion handle or control snakes and bats?
9. Does the City take pets?
10. Who do I contact if I have a weed or nuisance complaint?
11. How long do I have to scoop my sidewalks after a snow storm?
12. How do I report dilapidated (rundown) properties?
13. How can I contact the inspector if I have questions?
14. Do I need a permit to replace my siding?
15. What number do I call for locating underground utility lines before I dig on my property?
16. How long after I obtain a permit do I have to begin construction?
17. Do I need a permit to re-roof my house?
18. Why is a building permit required?
19. How much does a building permit cost?
20. What information do I need to submit along with my building permit application?
21. Does my building permit cover the electrical and plumbing work?
22. Can I operate a business from my house?